Company News

Home > News information > Company News

Guizhou province huang ping project signing ceremony wuyang cement co., LTD

After nearly one year of tracking and contact, in the power generation technology team with the full support and cooperation, through continuous improvement of technical solutions and many business negotiations, our institute had signed a general contract with Guizhou HuangPing Wuyang Cement Limited Company in January 7th 2015. This project is a technological renovation engineering which need to relocated a 4500t/d New Dry Process Cement Clinker Production Line to a new region and building a power generation by using waster heat of pure temperature cement kiln.

    The engineering is located in Guizhou Province Huangping Gu Long Industrial Development Zone. The total installed capacity is 9MW which is installed by two waste heat boilers with a turbo-generator unit. The project start is expected in May 2015 and the total duration is estimated to be 240 days.

                                             (Business Department)